Phase 1: Fundraising

Complete

Indiegogo Campaign: The Cache Line Cipher Geocoin

Phase 2: Ordering of Assets

Complete

Phase 3: Component Manufacturing

Asset inventory
Some assets ordered are commissioned by 3rd parties and must be received to complete assembly of Artifact orders.
100%
Asset construction
Some assets require production - construction and assembly - in preparation for infusion:
Consoles + Mounts + Stands
100%
Coupling Identities
Mounts must be coupled to the CLHQ Mainframe utilizing a unique coupling code engraved into each for easy identification. Imprints are also engraved with a code identifying their unique imagery.
100%
Material Infusion
Most assets are infused with a proprietary compound, a complex synthesis of trans-dimensional substances, enabling artifacts to connect to the CLHQ Mainframe.
100%
Imprint engraving
CLD Portal technology developed at CLHQ allows capturing of imagery visible through portals, shown to effectively enhance CLD signal detection. These are stamped on special discs.
100%
Preparation complete
Orders must be assembled with completed assets, protected and prepared for shipping with a shipping partner.
100%
Orders Shipped
Packages are delivered to the shipping partner for distribution. Once received and activated, the infused artifacts will form a world-spanning network to better interact with the CLD.
96%

1 The manufacturing process includes design and mass replication of every component that comprises the artifact and core mounts, plus the portal stand, and the four console sizes.

2 Once fabricated, the components must be assembled, and where relevant infused each with their own unique signature coupling code, along with the proprietary transdimension chemical compounds for best functionality bridging between the CLD and the CLHQ Mainframe.

3 Portal Imprint imagery is captured by CLHQ, and must be projected and engraved upon the imprint discs to be distributed with each package.

4 An instruction pamphlet outlining package contents and a guide for calibrating and activating your Cache Line Artifacts must be included with each package.

5 All packages must then be assembled, with contents verified as well as shipping destination, before heading to shipping phase.

Phase 4: Shipping and Distribution

In progress...

6Each package ordered will need final destination confirmed before being mailed or delivered.

7On delivery, recipients of the packages are asked to verify successful shipment by activating their artifacts and registering them as received with CLHQ.

8Geocoins and Pathtags may be tracked and treated as standard geocoins and pathtags, if desired.

9The mounts and consoles activated at CLHQ will remain ready and waiting for communications and signals detected from the CLD. CLHQ may require help deciphering communications and glyphs.

The bags are being packed... Are you ready to go?
Are you ready to embark on this excellent geocaching adventure?